PSTN & Broadband Line Audit
other jobs JOB SWITCH LTD
Added before 5 Days
  • England,Yorkshire and The Humber,Lincolnshire
  • Full Time, Contract
  • £220 - £230 per day
Job Description:
Full job description*Work Specification: PSTN & Broadband Line Audit (Contractor)
*1. Purpose


The purpose of this engagement is to undertake a comprehensive audit of all PSTN and broadband lines across Lincolnshire County Council (LCC) to:
*Validate whether each line is still required
*Identify ownership and accountability
*Confirm supplier/provider details
*Produce a clear, evidenced recommendation for retention or cessation
The audit will support cost reduction, service optimisation, and governance compliance.


2.1 Asset Identification*Compile a complete inventory of:
*PSTN lines
*Broadband circuits (including DSL, FTTC, FTTP, leased lines)
*Reconcile data from:
*Existing supplier invoices
*Internal records / CMDB (where available)
*Local site validation where required
2.2 Data Capture (Per Line)For each identified line, the contractor must capture:
*Line reference / circuit ID
*Physical location / site
*Business use (if identifiable)
*Associated service/system (if known)
*Service owner (named individual or role)
*Site contact / suite contact
*Supplier / provider
*Contract status (if known)
*Cost (where available)
2.3 Validation of RequirementFor each line:
*Engage with service owners / site contacts to confirm:
*Whether the line is still required
*Whether the service can be rationalised, migrated, or ceased
*Document:
*Confirmed required lines
*Lines with no identifiable owner
*Lines confirmed as redundant
3. Outputs & DeliverablesThe contractor shall produce the following:
3.1 Master Audit RegisterA structured dataset (Excel or agreed format) containing:
*Full list of all lines identified
*All captured attributes (as outlined above)
*Status classification:
*Keep
*Cease
*Under Review / Unknown
3.2 Audit Findings ReportA written report including:
*Summary of total lines identified
*Breakdown by status (Keep / Cease / Unconfirmed)
*Key risks and issues (e.g. orphaned lines, duplicate services)
*Opportunities for cost savings
*Recommendations for rationalisation
3.3 Cessation Schedule*Prioritised list of lines recommended for cease
*Grouped by:
*Supplier
*Site
*Service impact risk
4. Audit Trail & Evidence RequirementsThe contractor must maintain a robust and auditable evidence base, including:
*Record of all communications with service owners
*Decision logs for each line (retain vs cease)
*Supporting evidence for decisions (email confirmations, system checks, etc.)
*Version-controlled audit dataset
This aligns to LCC expectations for audit transparency, traceability, and governance, including:
*Full audit logs
*Evidence chain for decisions
*Clear ownership and change tracking
5. Methodology PSTN & Broadband Line Audit The contractor shall adopt a structured audit approach, including:
*Data discovery and reconciliation
*Stakeholder engagement
*Validation and challenge of existing records
*Evidence-based decision making
*Iterative refinement of the audit dataset
Audit activities must be clearly documented and repeatable, with defined roles, deliverables, and evidence requirements
6. Duration and Timeline*Total duration: 3 months
*Indicative phases:
*Phase 1: Discovery & data collection
*Phase 2: Validation & stakeholder engagement
*Phase 3: Final classification, reporting, and recommendations
7. Additional Requirement ? Soft Cease ActivityWhere sufficient time remains within the engagement:
*The contractor shall:
*Initiate soft cease requests with suppliers for lines confirmed as redundant
*Track status of cease requests
*Report progress and any constraints (e.g. contract lock-in, dependencies)
*All cease actions must:
*Be approved by LCC prior to submission
*Maintain a full audit trail of approvals and communications
8. Governance & Reporting*Weekly progress updates to LCC lead
*Regular reporting including:
*Progress against total lines
*Issues requiring escalation
*Emerging savings opportunities
*Final presentation of findings and recommendations
9. Roles and ResponsibilitiesContractor PSTN & Broadband Line Audit *Deliver all audit activities
*Maintain audit records and evidence
*Engage stakeholders
*Produce all outputs and reports
LCC PSTN & Broadband Line Audit *Provide access to available data sources
*Facilitate introductions to service owners / site contacts
*Approve cease recommendations
10. Success Criteria PSTN & Broadband Line Audit The engagement will be deemed successful where:
*A complete and validated inventory of lines exists
*Each line has:
*A confirmed status (keep/cease/unknown)
*Identified ownership (where possible)
*A clear list of lines to be ceased is agreed
*A full audit trail is maintained
*Opportunities for cost savings are clearly evidenced
Job number 3892396

Increase your exposure to recruiters with ProJobs

Thousands of recruiters are looking for you in the Job Master profile database, increase your exposure 4 times with a ProJob subscription

You can cancel your subscription at any time.
metapel
Company Details:
JOB SWITCH LTD
Company size:
Industry:
The jobs on site are for both men and women